Ieg, the company that organizes Vicenzaoro, has decided to invest 60 million to expand the spaces of Fiera Vicenza in view of the next event, set for 6 to 10 September. The redevelopment works have begun, as evidenced by the images, commented by the architect Mario Vescovo, director of the Vicenza headquarters of Ieg, as well as director of operations of the same plant: “After the official handover of the construction site area last February 12th to the company winner of the tender called by Ieg for the demolition, the environmental remediation operations are nearing completion to begin the subsequent demolition of pavilion 2. However, the dismantling of pavilion 5 has already been completed in recent days.

The demolition of the old pavilions will be completed within the next four months, including the removal of the foundations, to prepare the land for the new construction on the same footprint as the new building of approximately 22,000 square meters, designed by Studio GMP of Hamburg. The new building will be developed on two levels and will be completed in the first half of 2026.


Latest from news
The Richemont group is interested in joining the race to acquire the brand synonymous with diamonds.
Jewelry by contemporary artists and historic pieces feature in an online sale hosted by the auction
Survey results presented during a meeting at the Senate, organized by Federpreziosi Confcommercio. The Italian jewelry
An event hosted by the American Maison for the Artist-to-Artist edition of Frieze London 2026. Tiffany
Fourth edition of the Valenza Gem Forum, promoted by the Fondazione Mani Intelligenti in collaboration with
